Project: Machine optimisation
Task:
Reconstruction of a chocolate machine in the foodstuff industry
Challenge:
Simultaneous production conversion in multiple locations within a tight schedule
Permatech solution:
Planning and coordination of Europe-wide machine optimisation by the same deadline. This required strict adherence to a precise schedule that involved minimal disruption to production. This was achieved thanks to the targeted, efficient use of personnel and central project management.